Non-Fiction, Forecast & Outlook, Infrastructure

Artificial Intelligence Data Center Outlook

Forecast colocation demand, liquid cooling adoptio

by Peachey Jacquelynn

  • English
  • 147 pages
  • 2026
  • SamEnrico

Forecast colocation demand, liquid cooling adoption, power infrastructure, and geographic shifts for AI-optimized data centers through 2030.

Formats

About this book

Forecast colocation demand, liquid cooling adoption, power infrastructure, and geographic shifts for AI-optimized data centers through 2030.

Free sample

Chapter 1: The 120k W Chasm--The first time Elena saw a stranded asset, it was a nine-story concrete tomb in Santa Clara, California.She was twenty-seven years old, three weeks into her role as Director of Infrastructure Strategy at a then-obscure AI startup called Lattice Mind. The building had been built in 2018—less than six years earlier—by a colocation provider that had raised $400 million on the promise of being "cloud-agnostic and future-proof." It had white walls, biometric scanners, raised floors, and exactly 8.2 megawatts of critical IT load capacity. In 2018, that made it a crown jewel.In 2024, the day Elena toured it, the building was empty.Not half-empty. Not in the process of being turned down. Completely, eerily, dust-on-the-floor empty.

The sales director walking her through kept using phrases like "between tenants" and "strategic repositioning," but Elena noticed the mold smell in the cooling towers and the way the UPS batteries had swollen from three years of discharge cycles with no replacement. She noticed, most of all, the rack labels still taped to the empty cabinets: Client: Major Telco – 6.5k W average. Client: Enterprise Saa S – 4.8k W average. Client: Financial Services – 7.2k W average.Those clients had left. Not because the building was poorly managed.

Not because the power went out. They left because, one by one, they had asked the colocation provider a simple question: Can you give us a 50k W rack for our new GPU clusters?The answer, every time, was no. The building's electrical distribution was maxed at 15k W per cabinet. The cooling system was a raised-floor air handler designed for a different era. Retrofitting would have required ripping out the floor, replacing the busway, installing liquid cooling distribution units, and upgrading the utility feed—a $50 million project that would take eighteen months and require vacating the entire building anyway.So the tenants left.

And the building sat. And the colocation provider's $400 million asset was worth, at best, the land beneath it.Elena walked out of that tour, got in her rental car, and called her CEO. "We need to build our own data centers,"…

This is the end of the free sample. Get the eBook to keep going. Buy now

Read a sample →

Contents

  1. Chapter 1
  2. Chapter 2
  3. Chapter 3
  4. Chapter 4
  5. Chapter 5
  6. Chapter 6
  7. Chapter 7
  8. Chapter 8
  9. Chapter 9
  10. Chapter 10
  11. Chapter 11
  12. Chapter 12

Details

Author
Peachey Jacquelynn
Publisher
SamEnrico
Language
English
Genre
Non-Fiction, Forecast & Outlook, Infrastructure
Released
2026-05-30
Pages (approx.)
147
Available as
eBook, Audiobook

Read better in the ZLOADR app

Your eBooks on your phone or tablet. Sign in with your SamEnrico account and start reading.

More by Peachey Jacquelynn

See all

You may also like

See all