Non-FictionForecast & OutlookInfrastructure

Artificial Intelligence Data Center Outlook Audiobook

Forecast colocation demand, liquid cooling adoptio

by Peachey Jacquelynn

  • English
  • 147 pages
  • 2026
  • SamEnrico

Forecast colocation demand, liquid cooling adoption, power infrastructure, and geographic shifts for AI-optimized data centers through 2030.

Formats

Free sample

Chapter 1: The 120k W Chasm--The first time Elena saw a stranded asset, it was a nine-story concrete tomb in Santa Clara, California.She was twenty-seven years old, three weeks into her role as Director of Infrastructure Strategy at a then-obscure AI startup called Lattice Mind. The building had been built in 2018—less than six years earlier—by a colocation provider that had raised $400 million on the promise of being "cloud-agnostic and future-proof." It had white walls, biometric scanners, raised floors, and exactly 8.2 megawatts of critical IT load capacity. In 2018, that made it a crown jewel.In 2024, the day Elena toured it, the building was empty.Not half-empty. Not in the process of being turned down. Completely, eerily, dust-on-the-floor empty.

The sales director walking her through kept using phrases like "between tenants" and "strategic repositioning," but Elena noticed the mold smell in the cooling towers and the way the UPS batteries had swollen from three years of discharge cycles with no replacement. She noticed, most of all, the rack labels still taped to the empty cabinets: Client: Major Telco – 6.5k W average. Client: Enterprise Saa S – 4.8k W average. Client: Financial Services – 7.2k W average.Those clients had left. Not because the building was poorly managed.

Not because the power went out. They left because, one by one, they had asked the colocation provider a simple question: Can you give us a 50k W rack for our new GPU clusters?The answer, every time, was no. The building's electrical distribution was maxed at 15k W per cabinet. The cooling system was a raised-floor air handler designed for a different era. Retrofitting would have required ripping out the floor, replacing the busway, installing liquid cooling distribution units, and upgrading the utility feed—a $50 million project that would take eighteen months and require vacating the entire building anyway.So the tenants left.

And the building sat. And the colocation provider's $400 million asset was worth, at best, the land beneath it.Elena walked out of that tour, got in her rental car, and called her CEO. "We need to build our own data centers," she said. "Not because we want to be landlords. Because no one else is building what we're about to need."That conversation, and the five years of infrastructure hell that followed, is why this book exists.The Density Wall That No One Saw Coming For the better part of four decades, the…

This is the end of the free sample. Get the Audiobook to keep going. Buy now

About this book

Forecast colocation demand, liquid cooling adoption, power infrastructure, and geographic shifts for AI-optimized data centers through 2030.

Details

Author
Peachey Jacquelynn
Publisher
SamEnrico
Language
English
Genre
Non-Fiction, Forecast & Outlook, Infrastructure
Released
2026-05-30
Pages (approx.)
147
Available as
eBook, Audiobook

Listen in the VoxFlicks app

Audiobooks and audio dramas wherever you go. Sign in with your SamEnrico account and press play.

More by Peachey Jacquelynn

See all

You may also like

See all