Artificial Intelligence Data Center Outlook
Forecast colocation demand, liquid cooling adoptio
Forecast colocation demand, liquid cooling adoption, power infrastructure, and geographic shifts for AI-optimized data centers through 2030.
Formats
About this book
Free sample
Chapter 1: The 120k W Chasm--The first time Elena saw a stranded asset, it was a nine-story concrete tomb in Santa Clara, California.She was twenty-seven years old, three weeks into her role as Director of Infrastructure Strategy at a then-obscure AI startup called Lattice Mind. The building had been built in 2018—less than six years earlier—by a colocation provider that had raised $400 million on the promise of being "cloud-agnostic and future-proof." It had white walls, biometric scanners, raised floors, and exactly 8.2 megawatts of critical IT load capacity. In 2018, that made it a crown jewel.In 2024, the day Elena toured it, the building was empty.Not half-empty. Not in the process of being turned down. Completely, eerily, dust-on-the-floor empty.
The sales director walking her through kept using phrases like "between tenants" and "strategic repositioning," but Elena noticed the mold smell in the cooling towers and the way the UPS batteries had swollen from three years of discharge cycles with no replacement. She noticed, most of all, the rack labels still taped to the empty cabinets: Client: Major Telco – 6.5k W average. Client: Enterprise Saa S – 4.8k W average. Client: Financial Services – 7.2k W average.Those clients had left. Not because the building was poorly managed.
Not because the power went out. They left because, one by one, they had asked the colocation provider a simple question: Can you give us a 50k W rack for our new GPU clusters?The answer, every time, was no. The building's electrical distribution was maxed at 15k W per cabinet. The cooling system was a raised-floor air handler designed for a different era. Retrofitting would have required ripping out the floor, replacing the busway, installing liquid cooling distribution units, and upgrading the utility feed—a $50 million project that would take eighteen months and require vacating the entire building anyway.So the tenants left.
And the building sat. And the colocation provider's $400 million asset was worth, at best, the land beneath it.Elena walked out of that tour, got in her rental car, and called her CEO. "We need to build our own data centers,"…
This is the end of the free sample. Get the eBook to keep going. Buy now
Contents
- Chapter 1
- Chapter 2
- Chapter 3
- Chapter 4
- Chapter 5
- Chapter 6
- Chapter 7
- Chapter 8
- Chapter 9
- Chapter 10
- Chapter 11
- Chapter 12
Details
- Author
- Peachey Jacquelynn
- Publisher
- SamEnrico
- Language
- English
- Genre
- Non-Fiction, Forecast & Outlook, Infrastructure
- Released
- 2026-05-30
- Pages (approx.)
- 147
- Available as
- eBook, Audiobook
Read better in the ZLOADR app
Your eBooks on your phone or tablet. Sign in with your SamEnrico account and start reading.
More by Peachey Jacquelynn
Self Hypnosis For Creativity BoostPeachey Jacquelynn$11.99
Iran Iraq War OriginsPeachey Jacquelynn$11.99
GAD OCD Overlap GuidePeachey Jacquelynn$11.99
Sales Channel Intensity MapPeachey Jacquelynn$11.99
ABCDE Method for MinimalistsPeachey Jacquelynn$11.99
Tangaroa's Call: The First Navigator's VoyagePeachey Jacquelynn$11.99
The Celestial Cartographer: How a Dutch Trader and a Javanese Astronomer Redrew the StarsPeachey Jacquelynn$11.99
Funding Your Dream Abroad for AfricansPeachey Jacquelynn$12.99
Vinyl Cutter OperatorPeachey Jacquelynn$11.99
How to Become a SecretaryPeachey Jacquelynn$11.99
Understanding Hairy TonguePeachey Jacquelynn$17.99


