Non-FictionOperational Efficiency ManualLean Scheduling

Lean Production Scheduling Audiobook

Apply lean principles including pull systems, flow

by Daniel Tanya

  • English
  • 153 pages
  • 2026
  • SamEnrico

Apply lean principles including pull systems, flow manufacturing, and visual management to scheduling.

Formats

Free sample

Chapter 1: The Utilization Trap--–- Every morning at 7:45 AM, Tom checked the OEE dashboard. The Overall Equipment Effectiveness number for the stamping press was 94% – green, healthy, excellent. The assembly line was at 91%. The CNC department was at 88%. By every traditional measure, his factory was a well-oiled machine.

His bonus depended on those numbers. His plant manager celebrated them in the weekly operations review. And yet, customer orders were late. Inventory was piled in every aisle. Expeditors ran from machine to machine waving red folders.

Tom could not understand how a factory running at 90% utilization could be failing so miserably.He was not alone. This is the great paradox of modern manufacturing: the harder you push for efficiency, the further you fall behind. The tools that promise high utilization – releasing work orders as fast as possible, keeping every machine busy, maximizing output – actually create the very chaos they are meant to solve. This chapter will prove that what most managers call “high velocity” is actually a slow-motion disaster. And it will introduce the single most important shift in thinking you will make: the difference between Push and Pull.The Machine That Ran Too Fast Let us begin with a story.

A mid-sized automotive supplier – let us call them Precision Stamping – was losing money on a contract that looked profitable on paper. The plant manager, a veteran of Lean Six Sigma, had done everything right. He had installed OEE tracking on every critical machine. He had incentives for operators who hit utilization targets. He had a scheduling team that released work orders the moment raw materials arrived.The stamping press ran at 98% utilization.

It never stopped. And that was the problem.Because the press ran so fast, it produced stamped parts faster than the downstream welding cell could process them. The welders, overwhelmed, built a queue of 5,000 parts. The queue grew so large that forklifts had to move parts to an overflow warehouse. The warehouse filled up, so the press operator had to stop – not because the press was broken, but because there was literally no place to put the output.

Then the welding cell, starved of the correct mix of parts, ran out of specific variants. The assembly line stopped. The plant manager expedited the missing variants. The press ran overtime to catch up. The queue grew again.The cycle repeated every two weeks.

Utilization remained high. Profitability collapsed.This is the Utilization Trap. It is the single most destructive force in production scheduling, and…

This is the end of the free sample. Get the Audiobook to keep going. Buy now

About this book

Apply lean principles including pull systems, flow manufacturing, and visual management to scheduling.

Details

Author
Daniel Tanya
Publisher
SamEnrico
Language
English
Genre
Non-Fiction, Operational Efficiency Manual, Lean Scheduling
Released
2026-05-30
Pages (approx.)
153
Available as
eBook, Audiobook

Listen in the VoxFlicks app

Audiobooks and audio dramas wherever you go. Sign in with your SamEnrico account and press play.

More by Daniel Tanya

See all

You may also like

See all