Non-FictionOperational Efficiency ManualChangeover

Sequencing for Changeover Reduction

Groups similar products together and sequences cha

by Briones Avery

  • English
  • 147 pages
  • 2026
  • SamEnrico

Groups similar products together and sequences changeovers to minimize setup time, increase OEE, and improve production responsiveness.

Formats

About this book

Groups similar products together and sequences changeovers to minimize setup time, increase OEE, and improve production responsiveness.

Free sample

Chapter 1: The $10,000 Hour--–- On a Tuesday morning in March, I watched a 2.5millioninjectionmoldingmachinesitidleforforty−sevenminutes.Itwasnotbroken.Itwasnotwaitingformaterial.Itwasnotundergoingscheduledmaintenance.Themachinewaswaitingbecauseanoperatornamed Davecouldnotfindawrenchthathadbeen“borrowed”bythenightshiftthreehoursearlier.Thatwrenchwasonacarttwoaislesover,hidingunderagreasyrag.Forty−sevenminutes.Atthatplant’sfullyburdenedhourlyrateof2.5 million injection molding machine sit idle for forty-seven minutes. It was not broken. It was not waiting for material. It was not undergoing scheduled maintenance. The machine was waiting because an operator named Dave could not find a wrench that had been “borrowed” by the night shift three hours earlier.

That wrench was on a cart two aisles over, hiding under a greasy rag. Forty-seven minutes. At that plant’s fully burdened hourly rate of 2.5millioninjectionmoldingmachinesitidleforforty−sevenminutes.Itwasnotbroken.Itwasnotwaitingformaterial.Itwasnotundergoingscheduledmaintenance.Themachinewaswaitingbecauseanoperatornamed Davecouldnotfindawrenchthathadbeen“borrowed”bythenightshiftthreehoursearlier.Thatwrenchwasonacarttwoaislesover,hidingunderagreasyrag.Forty−sevenminutes.Atthatplant’sfullyburdenedhourlyrateof480, the direct cost was 376.Buttherealcost—theonethatneverappearsonanyprofit−and−lossstatement—wascloserto376. But the real cost—the one that never appears on any profit-and-loss statement—was closer to 376.Buttherealcost—theonethatneverappearsonanyprofit−and−lossstatement—wascloserto7,800 in lost capacity, delayed shipments, and the overnight freight charges that would be needed to make the customer whole. I tell you this story because that morning changed how I think about every factory I have ever visited.

That morning, I learned the truth that most manufacturing leaders never discover: changeover time is not about speed. It is about sequence.The Great Lie of Economic Order Quantity Let me begin with a confession. I spent the first decade of my career believing that changeover time was a fixed property of a machine. You have a press, a mold, a line—it takes what it takes. The job of the industrial engineer is to measure it, report it, and maybe shave off a few minutes through better training or more practice.

This belief is not stupid. It is taught in every operations management textbook in the world. It is embedded in every Enterprise Resource Planning system ever written. It has a name, a formula, and a hundred years of academic respectability. That name is Economic Order Quantity, or EOQ.The EOQ formula was derived in 1913 by Ford W.

Harris, an industrial engineer who probably never imagined that his simple equation would still be dictating production decisions in the…

This is the end of the free sample. Get the eBook to keep going. Buy now

Read a sample →

Contents

  1. Chapter 1
  2. Chapter 2
  3. Chapter 3
  4. Chapter 4
  5. Chapter 5
  6. Chapter 6
  7. Chapter 7
  8. Chapter 8
  9. Chapter 9
  10. Chapter 10
  11. Chapter 11
  12. Chapter 12

Details

Author
Briones Avery
Publisher
SamEnrico
Language
English
Genre
Non-Fiction, Operational Efficiency Manual, Changeover
Released
2026-05-30
Pages (approx.)
147
Available as
eBook, Audiobook

Read better in the ZLOADR app

Your eBooks on your phone or tablet. Sign in with your SamEnrico account and start reading.

More by Briones Avery

See all

You may also like

See all