Non-FictionBusiness Brief

Construction Climate Insurance Guide

Protect job sites and equipment from weather delay

by Jaynes Sima

  • English
  • 158 pages
  • 2026
  • SamEnrico

Protect job sites and equipment from weather delays and extreme events during builds.

Formats

About this book

Protect job sites and equipment from weather delays and extreme events during builds.

Free sample

Chapter 1: The Million-Dollar Weather Report–- The rain started at 2:17 PM on a Tuesday. By 2:45, the excavation pit on the 47millionmixed−useprojectin Austin,Texas,wasaswimmingpool.By3:30,thetemporaryaccessroad–theonlywayinoroutofthesite–wasariver.Bymidnight,thegeneralcontractorhadcalculatedhislosses:47 million mixed-use project in Austin, Texas, was a swimming pool. By 3:30, the temporary access road – the only way in or out of the site – was a river. By midnight, the general contractor had calculated his losses: 47millionmixed−useprojectin Austin,Texas,wasaswimmingpool.By3:30,thetemporaryaccessroad–theonlywayinoroutofthesite–wasariver.Bymidnight,thegeneralcontractorhadcalculatedhislosses:890,000 in damaged electrical gear stored at the bottom of the pit, 210,000inextendedequipmentrentalsforthecranethatcouldn′tmove,210,000 in extended equipment rentals for the crane that couldn't move, 210,000inextendedequipmentrentalsforthecranethatcouldn′tmove,340,000 in idle labor costs for 47 workers who couldn't work for six days, and a $1.2 million claim that his insurance company would deny four months later citing the "surface water exclusion." The project finished 11 weeks late. The contractor lost his line of credit.

Two years later, he was out of business.At the exact same hour that the Austin rain began, a project superintendent 1,400 miles away in Charlotte, North Carolina, received a text alert from his weather monitoring service: "Flash flood warning issued for Mecklenburg County until 8 PM. Rainfall rates up to 2 inches per hour expected." He had prepared for this. Three days earlier, based on a 10-day forecast showing a 60% chance of heavy rain, he had moved every piece of electrical equipment from the basement to the second floor, chained his excavators to concrete anchors on high ground, staged two dewatering pumps at the edge of the excavation pit, and texted his crew: "If rain exceeds 1 inch in 4 hours, do not report to site – I'll call you with updates." The storm came. The site got 3.7 inches of rain. The damage?

$4,200 in silt fence repair and one ruined hard hat. The insurance claim? He didn't file one. He didn't need to.Two contractors. Two storms of similar intensity.

One lost nearly a million dollars and his business. The other lost less than the cost of a used pickup truck. The difference was not luck. It was not superior insurance. It was not even a bigger budget.

The difference was that the Charlotte superintendent had learned something that the Austin contractor had not: the weather report is…

This is the end of the free sample. Get the eBook to keep going. Buy now

Read a sample →

Contents

  1. Chapter 1
  2. Chapter 2
  3. Chapter 3
  4. Chapter 4
  5. Chapter 5
  6. Chapter 6
  7. Chapter 7
  8. Chapter 8
  9. Chapter 9
  10. Chapter 10
  11. Chapter 11
  12. Chapter 12

Details

Author
Jaynes Sima
Publisher
SamEnrico
Language
English
Genre
Non-Fiction, Business Brief
Released
2026-06-01
Pages (approx.)
158
Available as
eBook, Audiobook

Read better in the ZLOADR app

Your eBooks on your phone or tablet. Sign in with your SamEnrico account and start reading.

More by Jaynes Sima

See all

You may also like

See all