Calculate economic batch quantities and changeover schedules to balance inventory and setup costs.

Formats

Free sample

Chapter 1: The $10 Million Mistake--–- Maria Vasquez stared at the warehouse report, her coffee growing cold for the third time that morning. The numbers didn’t make sense. According to her ERP system, Precision Stamping Inc. held $8.2 million in finished goods inventory. Yet every Monday, without fail, the production meeting erupted into the same argument: “We don’t have enough of the right parts to ship this week’s orders.”She pulled up the inventory aging report.

Product code PS-4420, a simple stamped bracket for a major automotive customer, had 187,000 units in stock. That was eleven months of demand. PS-4420 hadn’t been produced in nine weeks. Meanwhile, product PS-4490, a nearly identical bracket for the same customer, was on backorder with negative 12,000 units on hand. The last run of PS-4490 was fourteen weeks ago.How could one plant simultaneously drown in inventory of one part and starve for another?Maria walked out onto the shop floor.

The press line was running PS-4450, a medium-volume part that had been running continuously for three shifts. The setup team was playing cards at a table near the tool crib. They hadn’t touched a die in eighteen hours.“Why are we still running PS-4450?” she asked the shift supervisor, a grizzled veteran named Hank.“Because the setup costs are killing us,” Hank said without looking up from his phone. “Every changeover costs five thousand dollars in downtime, labor, and scrap. Bill in accounting told us we need to run at least two full shifts before it’s worth switching.”Maria walked back to her office and pulled up the setup cost data in the ERP system.

Sure enough, line item after line item showed a standard cost of $4,850 per changeover, allocated across all products evenly. The number had been entered by a consultant named Roger in 2014. Roger had since retired to Florida. No one had questioned the number in a decade.That evening, Maria stayed late. She grabbed a stopwatch, a notebook, and stood next to the press line as it finished its run of PS-4450 at 7:14 PM.

What she witnessed over the next ninety minutes would change everything she thought she knew about production management.The setup began. Two setup technicians walked to the press. One fetched tools from the crib—a five-minute walk each way because the crib was on the opposite side of the plant. The other located the new die…

This is the end of the free sample. Get the Audiobook to keep going. Buy now

About this book

Calculate economic batch quantities and changeover schedules to balance inventory and setup costs.

Details

Author
Laporte Emerson
Publisher
SamEnrico
Language
English
Genre
Non-Fiction, Operational Efficiency Manual, Batch Sizing
Released
2026-06-01
Pages (approx.)
139
Available as
eBook, Audiobook

Listen in the VoxFlicks app

Audiobooks and audio dramas wherever you go. Sign in with your SamEnrico account and press play.

More by Laporte Emerson

See all

You may also like

See all