Implements Johnson's rule, Campbell-Dudek-Smith, and Palmer's heuristic for multi-machine sequencing to minimize makespan.

Formats

Free sample

Chapter 1: The Hidden Tax--–- The aluminum casting plant in Toledo, Ohio, ran three shifts, employed 340 people, and had never missed a payroll in 47 years. By every conventional measure, it was a successful family-owned business. The plant manager, a 28-year veteran named Diane Castellano, had six sigma black belts, a lean manufacturing certification, and a wall full of safety awards. What she did not have was a working theory for why her second shift—the one with her most experienced operators—consistently produced 18 percent less than the first shift, despite identical machines, identical jobs, and identical job sequences.For six months, Diane blamed the operators. She had meetings.

She posted charts. She threatened to rotate the entire crew to the undesirable third shift. Nothing changed.Then, on a Thursday afternoon in April, a production scheduler named Marcos—twenty-three years old, six months out of a state university industrial engineering program, and carrying a stained spiral notebook—asked a question that no one had asked in the plant's history. "What order are we actually running these jobs on Machine 4?" he said. Diane pulled up the schedule on the ERP terminal.

The sequence was there, printed clearly: Job A, then Job B, then Job C, then Job D. Marcos walked to the shop floor, counted the stack of pallets waiting at Machine 4, and came back with a different sequence: Job C, then Job A, then Job D, then Job B. The ERP system's sequence and the floor's actual sequence matched on only two out of seventeen jobs that day.The second shift was not lazy. The second shift was not poorly trained. The second shift was executing the wrong job order because the formal schedule was impossible to follow given the physical layout of the floor and the arrival times of raw materials.

And that wrong order—that invisible, unmeasured, unmanaged sequence—was adding forty-seven minutes of makespan every single shift.Forty-seven minutes per shift times two shifts per day times five days per week times fifty weeks per year. Diane did the math on a scrap of cardboard. Over 391 hours of lost throughput annually. At the plant's average contribution margin of 4,200perhour,thatsequence−inducedwastetotaledmorethan4,200 per hour, that sequence-induced waste totaled more than 4,200perhour,thatsequence−inducedwastetotaledmorethan1.6 million per year. One point six million dollars.

From the order of jobs on a single bottleneck machine.This book is about how to find those hidden millions in…

This is the end of the free sample. Get the Audiobook to keep going. Buy now

About this book

Implements Johnson's rule, Campbell-Dudek-Smith, and Palmer's heuristic for multi-machine sequencing to minimize makespan.

Details

Author
Cass Zandra
Publisher
SamEnrico
Language
English
Genre
Non-Fiction, Operational Efficiency Manual, Scheduling Algorithms
Released
2026-05-30
Pages (approx.)
152
Available as
eBook, Audiobook

Listen in the VoxFlicks app

Audiobooks and audio dramas wherever you go. Sign in with your SamEnrico account and press play.

More by Cass Zandra

See all