Non-FictionOperational Efficiency ManualBatch Sizing
Production Run Optimization eBook
Calculate economic batch quantities and changeover
Calculate economic batch quantities and changeover schedules to balance inventory and setup costs.
Formats
Free sample
Chapter 1: The $10 Million Mistake--–- Maria Vasquez stared at the warehouse report, her coffee growing cold for the third time that morning. The numbers didn’t make sense. According to her ERP system, Precision Stamping Inc. held $8.2 million in finished goods inventory. Yet every Monday, without fail, the production meeting erupted into the same argument: “We don’t have enough of the right parts to ship this week’s orders.”She pulled up the inventory aging report.
Product code PS-4420, a simple stamped bracket for a major automotive customer, had 187,000 units in stock. That was eleven months of demand. PS-4420 hadn’t been produced in nine weeks. Meanwhile, product PS-4490, a nearly identical bracket for the same customer, was on backorder with negative 12,000 units on hand. The last run of PS-4490 was fourteen weeks ago.How could one plant simultaneously drown in inventory of one part and starve for another?Maria walked out onto the shop floor.
The press line was running PS-4450, a medium-volume part that had been running continuously for three shifts. The setup team was playing cards at a table near the tool crib. They hadn’t touched a die in eighteen hours.“Why are we still running PS-4450?” she asked the shift supervisor, a grizzled veteran named Hank.“Because the setup costs are killing us,” Hank said without looking up from his phone. “Every changeover costs five thousand dollars in downtime, labor, and scrap. Bill in accounting told us we need to run at least two full shifts before it’s worth switching.”Maria walked back to her office and pulled up the setup cost data in the ERP system.
Sure enough, line item after line item showed a standard cost of $4,850 per changeover, allocated across all products evenly. The number had been entered by a consultant named Roger in 2014. Roger had since retired to Florida. No one had questioned the number in a decade.That evening, Maria stayed late. She grabbed a stopwatch, a notebook, and stood next to the press line as it finished its run of PS-4450 at 7:14 PM.
What she witnessed over the next ninety minutes would change everything she thought she knew about production management.The setup began. Two setup technicians walked to the press. One fetched tools from the crib—a five-minute walk each way because the crib was on the opposite side of the plant. The other located the new die for PS-4470, which was stored on a rack three rows deep. Moving it took twenty-three minutes because a forklift was blocked by pallets of raw steel that should have been staged elsewhere.The actual die change—removing four bolts, sliding out the old die, sliding in the new, re-bolting—took eleven minutes.
Alignment and first-piece inspection took another fourteen minutes. Total elapsed time: ninety-three minutes.But here was the shock. During those ninety-three minutes, Maria noted which activities required the press to be stopped. The die change itself, alignment, and first-piece inspection? Yes—thirty-four minutes of internal setup.
Everything else? Walking, fetching tools, locating the die, moving pallets—fifty-nine minutes of external setup that could have been done while the previous run was still producing parts.She multiplied the ninety-three minutes by the plant’s burdened labor rate of 85perhour(includingbenefits,supervision,andallocatedoverhead).Thatcameto85 per hour (including benefits, supervision, and allocated overhead). That came to 85perhour(includingbenefits,supervision,andallocatedoverhead).Thatcameto132 per changeover in direct setup labor. Add a generous 50forscrapand50 for scrap and 50forscrapand100 for energy spikes during the restart. The true setup cost was under $300.Not $4,850.
Not even close.Maria sat down at her desk at 10:30 PM and recalculated the economic batch quantity for PS-4420 using the real setup cost. The result was a batch size of 4,200 units—not the 18,000 units the ERP system had been commanding. With the correct batch size, the plant could produce more frequently, carry 76% less inventory, and still have the same total annual setup cost.She printed the calculation and wrote one sentence at the bottom of the page: “We have been optimizing the wrong number for ten years.”That sentence would become Precision Stamping’s epitaph. By the time Maria presented her findings to the executive team, the damage was done. The automotive customer had already awarded 40% of their business to a competitor who offered weekly deliveries instead of monthly.
The competitor’s secret? They had correctly calculated their own setup costs and were running batches one-quarter the size of Precision’s.Eighteen months later, Precision Stamping filed for Chapter 11 bankruptcy. The warehouse that had held 8.2millionininventorywassoldatauctionfor8.2 million in inventory was sold at auction for 8.2millionininventorywassoldatauctionfor1.2 million. Maria took a job at a smaller, more agile manufacturer and swore she would never let a made-up number drive production decisions again.The Invisible War: Why Every Factory Faces This Choice The story of Precision Stamping is not an anomaly. It is the rule.
Walk into almost any manufacturing plant in the world, and you will find the same fundamental tension tearing at production schedules, inventory records, and monthly profit statements.On one side of the battlefield stands Setup Cost—the time, labor, and expense required to stop a machine, change its tooling or materials, and restart it to make a different product. Every time you run a batch, you incur this cost once. Therefore, logic suggests: run larger batches to spread that fixed cost over more units. Fewer setups, lower total setup cost.On the other side stands Holding Cost—the expense of keeping inventory in your warehouse. Every unit you produce sits somewhere, costing you money every single day.
Capital is tied up that could be used for new equipment or R&D. You pay for warehouse space, heating, cooling, insurance, and security. Products can become obsolete, damaged, or stolen. In food and pharma, they can expire and become worthless. Therefore, logic suggests: run smaller batches to keep less inventory.
Less inventory, lower holding cost.This is the great balancing act of production management. And most companies get it catastrophically wrong.Why? Because they don’t actually know their true setup costs or their true holding costs. They rely on legacy numbers from ERP systems, numbers that were someone’s best guess five or ten or twenty years ago. Those numbers have calcified into dogma.
And that dogma is quietly bleeding millions of dollars from the bottom line.The Anatomy of a Setup: Internal vs. External To understand why setup costs are so consistently miscalculated, we must first understand what a setup actually entails. The concept was pioneered by Shigeo Shingo, the Japanese industrial engineer who transformed Toyota’s production system in the 1950s and 1960s. Shingo made a deceptively simple distinction that changed manufacturing forever.Internal setup (which Shingo called “inside exchange of die”) refers to any setup activity that can only be performed while the machine is stopped. Changing a die, adjusting alignment, running first-piece inspection—these require the machine to be idle.
Every minute of internal setup is pure lost production capacity.External setup (or “outside exchange of die”) refers to any setup activity that can be performed while the machine is still running the previous batch. Fetching tools from the tool crib, preheating the next batch of raw…
This is the end of the free sample. Get the eBook to keep going. Buy now
About this book
Details
- Author
- Laporte Emerson
- Publisher
- SamEnrico
- Language
- English
- Genre
- Non-Fiction, Operational Efficiency Manual, Batch Sizing
- Released
- 2026-06-01
- Pages (approx.)
- 139
- Available as
- eBook, Audiobook
Read better in the ZLOADR app
Your eBooks on your phone or tablet. Sign in with your SamEnrico account and start reading.
More by Laporte Emerson
TM History Maharishi GuideLaporte Emerson$11.99
The Governor's MotorcadeLaporte Emerson$11.99
The Funnel for RoofersLaporte Emerson$11.99
Misconfigured Database Leak ScriptsLaporte Emerson$11.99
IBS Romberg Test GuideLaporte Emerson$11.99
The Last Broadcast: The Day the World Held Its BreathLaporte Emerson$11.99
The Phantom Gold: The 1968 Mexico City Marathon MysteryLaporte Emerson$11.99
Renovation HelperLaporte Emerson$11.99
Business Plan Language TranslationLaporte Emerson$12.99
Understanding Cleft Lip Palate Oligodontia Syndactyly Pili TortiLaporte Emerson$17.99
How to Become a Chalk-extruding-machine OperatorLaporte Emerson$11.99You may also like
Hong Kong Handover 1997Dunn Johnnie$11.99
Zumba For Postnatal Recovery CourseNeal Christian$11.99
Zumba for BeginnersLadner Nikia$11.99
YouTube Comment Mining GuideHumes Pandora$12.99
Worry Box MeditationCarlin Rudy$11.99
Workplace Stress MeditationNguyen Lynn$11.99
Workplace Stress and Sleep RepairHawley Ivory$11.99
Workplace Perfectionism CureDelaney Jeffry$11.99
Workplace Injustice Anger GuideWallen Isabelle$11.99
Work Addiction and Burnout LinkGreenwood Ester$11.99
Women in Yoga and WellnessBeattie Galina$11.99
Women in Stand Up ComedyChun Evangeline$11.99