Non-Fiction, Informative, Educational

Maintainability Engineering

A Coursebook on Maintainability Engineering

by Whitworth Gudrun

  • English
  • 135 pages
  • 2026
  • SamEnrico

A Coursebook on Maintainability Engineering

Formats

About this book

A Coursebook on Maintainability Engineering

Free sample

Chapter 1: The $500 Million Bolt--It was a Tuesday when the US Navy destroyer USS Fitzgerald lost its starboard propeller shaft bearing. Not catastrophically – not yet. But the vibration signature had crossed the red line, and the engineering log showed a bearing that was now running metal-on-metal. The part that failed cost 4,800.Theboltthatheldthebearinghousinginplace–asingle,1.5−inch,threadedfastener–cost4,800. The bolt that held the bearing housing in place – a single, 1.5-inch, threaded fastener – cost 4,800.Theboltthatheldthebearinghousinginplace–asingle,1.5−inch,threadedfastener–cost0.87 at a hardware store.The problem was not the bolt’s price.

The problem was its location.The bolt was accessible only by cutting through the ship’s armored hull. Not unbolting a panel. Not removing a floor grate. Cutting. With torches.

In a dry dock. The shipyard estimate came back: $2.1 million in labor, facility fees, and lost operational time. Plus six weeks of downtime during which the destroyer could not patrol, train, or defend. The bolt itself, once removed, was replaced in eleven seconds.This is not a story about a bolt. This is a story about what happens when engineers forget that everything breaks eventually – and that someone, somewhere, will have to fix it.The Seven Disasters That Gave Birth to a Discipline Before we define maintainability as an engineering science, we need to understand what happens without it.

The following seven disasters – each tied to one of the seven core principles of maintainability – are not hypotheticals. They are real failures that cost real money and, in some cases, real lives.Disaster 1: The Nuclear Valve That Required a Building Demolition In 1998, a boiling water reactor at a Midwestern US nuclear plant experienced a valve failure in its residual heat removal system. The valve was buried behind 14 feet of piping, two steel bulkheads, and a concrete biological shield. The manufacturer’s maintenance manual contained the phrase “access provided by removal of adjacent structures.” What the manual did not say was that “adjacent structures” included half the auxiliary building.The repair required cutting through reinforced concrete, removing working systems, and renting a custom portable scaffolding system. Total cost: 18million.Timetorepair:11months.Thevalveitselfcost18 million.

Time to repair: 11 months. The valve itself cost 18million.Timetorepair:11months.Thevalveitselfcost3,200.The violated principle: Accessibility. The valve was not reachable with standard…

This is the end of the free sample. Get the eBook to keep going. Buy now

Read a sample →

Contents

  1. Chapter 1
  2. Chapter 2
  3. Chapter 3
  4. Chapter 4
  5. Chapter 5
  6. Chapter 6
  7. Chapter 7
  8. Chapter 8
  9. Chapter 9
  10. Chapter 10
  11. Chapter 11
  12. Chapter 12

Details

Author
Whitworth Gudrun
Publisher
SamEnrico
Language
English
Genre
Non-Fiction, Informative, Educational
Released
2026-05-04
Pages (approx.)
135
Available as
eBook, Audiobook

Read better in the ZLOADR app

Your eBooks on your phone or tablet. Sign in with your SamEnrico account and start reading.

More by Whitworth Gudrun

See all