Non-FictionOperational Efficiency ManualBatch Sequencing
Batch Production Sequencing eBook
Sequence batches to minimize changeover time betwe
Sequence batches to minimize changeover time between similar products in batch manufacturing.
Formats
Free sample
Chapter 1: The Batch Paradox...--–- Every morning at 6:45 AM, Maria Vasquez, the production manager at Apex Plastics, walks onto the same shop floor she has managed for eleven years. She knows every machine by its sound—the high-pitched whine of the aging injection molder, the rhythmic thump of the hydraulic press, the hiss of the cooling towers. What she does not know, what no cost accounting system has ever told her, is that thirty-seven percent of her available capacity is invisible. It is not lost to breakdowns, not consumed by maintenance, not stolen by quality rework. It is simply disappearing into the gaps between batches, hidden in plain sight, buried in the assumption that changeovers just take as long as they take.This chapter is about why Maria cannot see that lost capacity, why most batch manufacturers cannot, and how a single shift in thinking—from optimizing the individual batch to optimizing the sequence of batches—unlocks a hidden factory already sitting on your shop floor.The Economics of the Single Batch Let us begin with a question that sounds simple but is not: What is the right size for a batch?If you have ever taken a production operations course, or worked with an ERP system, or sat through a finance presentation about inventory carrying costs, you have encountered the Economic Batch Quantity formula.
It is elegant, mathematical, and almost always wrong for high-mix environments. The EBQ formula balances two opposing costs: the cost of holding inventory (which increases as batch size increases) and the cost of changeovers (which decreases as batch size increases because you run fewer batches). The formula finds the point where the sum of these two costs is minimized.Consider a simple example. Suppose you have a machine that produces Product A. The demand is 10,000 units per year.
The changeover time is 2 hours, and you value your machine time at 200perhour,soeachchangeovercosts200 per hour, so each changeover costs 200perhour,soeachchangeovercosts400 in lost production. The holding cost is 2perunitperyear.The EBQformulatellsyouthattheoptimalbatchsizeisthesquarerootof(2×annualdemand×changeovercost÷holdingcost).Pluginthenumbers:squarerootof(2×10,000×2 per unit per year. The EBQ formula tells you that the optimal batch size is the square root of (2 × annual demand × changeover cost ÷ holding cost). Plug in the numbers: square root of (2 × 10,000 × 2perunitperyear.The EBQformulatellsyouthattheoptimalbatchsizeisthesquarerootof(2×annualdemand×changeovercost÷holdingcost).Pluginthenumbers:squarerootof(2×10,000×400 ÷ $2) = square root of (4,000,000) = 2,000 units.So you run batches of 2,000 units. You change over five times per year (10,000 ÷ 2,000).
Your total changeover cost is 2,000peryear.Youraverageinventoryis1,000units(halfthebatchsize),soyourholdingcostisalso2,000 per year. Your average inventory is 1,000 units (half the batch size), so your holding cost is also 2,000peryear.Youraverageinventoryis1,000units(halfthebatchsize),soyourholdingcostisalso2,000 per year. The formula says you have optimized.But here is the problem that the EBQ formula ignores, the problem that creates Maria's invisible factory: the formula assumes that changeovers are independent of sequence. It assumes that changing from Product A to Product B costs the same as changing from Product B to Product A, and that the cost is the same regardless of what you ran before and what you will run next. In any real batch manufacturing environment with more than a handful of products, this assumption is false.The Asymmetry That Changes Everything Walk into almost any batch manufacturing facility—plastics, chemicals, food and beverage, pharmaceuticals, printing, metal fabrication—and you will observe the same phenomenon.
Changing from dark resin to light resin takes ninety minutes because every trace of dark pigment must be purged from the system. Changing from light resin to dark resin takes thirty minutes because the dark pigment covers any residual light color. Changing from Product A to Product B might require replacing three dies and recalibrating six sensors. Changing from Product B to Product A might require replacing four dies and recalibrating eight sensors. The direction of the change matters.This asymmetry has profound implications that the EBQ formula never accounts for.
If changeover times depend on sequence, then the cost of a changeover is not fixed—it is a variable that you control through the order in which you schedule production. And if you control that variable, then the entire economic calculation of batch size changes. Running larger batches to reduce the number of changeovers may be the wrong answer if those changeovers could have been made dramatically cheaper simply by reordering the sequence.Maria at Apex Plastics discovered this the hard way. Her team ran two products, a clear polycarbonate part and a black ABS part. The changeover from clear to black took twenty minutes—just a color purge.
The changeover from black to clear took ninety minutes because the black pigment stained the barrel and required a full screw pull and cleaning. Her ERP system, using standard EBQ logic, recommended batch sizes of 5,000 units for both products based on an average changeover time of fifty-five minutes. But when Maria sequenced the black run immediately after the clear run—clear to black—she avoided the ninety-minute changeover entirely. By changing the sequence, not the batch size, she reduced total changeover time by sixty-five percent. The EBQ formula had been optimizing the wrong variable.The Secret Life of Waiting Inventory The EBQ formula has another blind spot, one that is even more damaging in practice.
It considers only two costs: changeover cost and inventory holding cost. It completely ignores the cost of waiting time, the cost of work-in-process inventory that is not finished goods but is also not raw material, the cost of the time that a batch spends sitting between operations while other batches run.Let me put a number on this for you. A study of thirty-seven batch manufacturing facilities across six industries found that the average batch spends ninety-four percent of its total lead time waiting—waiting for a machine to finish its current batch, waiting for a changeover to complete, waiting for a quality inspection, waiting for a transfer to the next operation. Only six percent of the time is the batch actually being worked on. This means that if you could eliminate all waiting time, you could reduce lead time by a factor of nearly seventeen to one.You cannot eliminate all waiting time, of course.
But you can reduce it dramatically through sequencing, because waiting time is not random. It is a direct consequence of sequencing decisions. When you run batches in an order that minimizes changeovers, machines spend less time idle and more time producing. When you sequence by family, you reduce the time that downstream operations spend waiting for the right parts. When you level the sequence to match customer demand, you reduce the time that finished goods spend in the warehouse.The EBQ formula treats inventory as a cost to be minimized through batch size optimization.
But it treats waiting time as zero. This is not a small oversight; it is a fundamental mis-specification of the problem. The real objective of batch production sequencing is not to minimize the sum of changeover cost and holding cost. It is to minimize total flow time—the time from raw material release to finished goods—while meeting customer due dates. Changeover cost and holding cost are inputs to that objective, not the objective itself.The Two Batches You Did Not Know You Had To understand why waiting time…
This is the end of the free sample. Get the eBook to keep going. Buy now
About this book
Details
- Author
- Coffman Tiffiny
- Publisher
- SamEnrico
- Language
- English
- Genre
- Non-Fiction, Operational Efficiency Manual, Batch Sequencing
- Released
- 2026-06-01
- Pages (approx.)
- 133
- Available as
- eBook, Audiobook
Read better in the ZLOADR app
Your eBooks on your phone or tablet. Sign in with your SamEnrico account and start reading.
More by Coffman Tiffiny
The One Page Meeting AgendaCoffman Tiffiny$11.99
The Lieutenant Governor's StoryCoffman Tiffiny$11.99
Webb Simpson Process BiographyCoffman Tiffiny$11.99
Digital Communication OverloadCoffman Tiffiny$11.99
Conversation Starters for GymsCoffman Tiffiny$11.99
The Bloomsbury Breakthrough: How Virginia Woolf and the Group Redefined ModernismCoffman Tiffiny$11.99
Chroma Clash: The Day the World Painted Pink for Breast CancerCoffman Tiffiny$11.99
Welder and FabricatorCoffman Tiffiny$11.99
How to Start a Hobby in LEGO - including Brikwars - and Lego MindstormsCoffman Tiffiny$11.99
Jumia YC Application LessonsCoffman Tiffiny$12.99
Understanding Cleidocranial Dysplasia Micrognathia Absent ThumbsCoffman Tiffiny$17.99You may also like
Hong Kong Handover 1997Dunn Johnnie$11.99
Zumba For Postnatal Recovery CourseNeal Christian$11.99
Zumba for BeginnersLadner Nikia$11.99
YouTube Comment Mining GuideHumes Pandora$12.99
Worry Box MeditationCarlin Rudy$11.99
Workplace Stress MeditationNguyen Lynn$11.99
Workplace Stress and Sleep RepairHawley Ivory$11.99
Workplace Perfectionism CureDelaney Jeffry$11.99
Workplace Injustice Anger GuideWallen Isabelle$11.99
Work Addiction and Burnout LinkGreenwood Ester$11.99
Women in Yoga and WellnessBeattie Galina$11.99
Women in Stand Up ComedyChun Evangeline$11.99