Non-Fiction, Operational Efficiency Manual, SMED

Setup Time Reduction Guide

Apply SMED methodology to reduce changeover times

by High Tod

  • English
  • 133 pages
  • 2026
  • SamEnrico

Apply SMED methodology to reduce changeover times and enable smaller batch production runs.

Formats

About this book

Apply SMED methodology to reduce changeover times and enable smaller batch production runs.

Free sample

Chapter 1: The Batch Trap--–- Every morning, production managers around the world make the same catastrophic decision. They look at their changeover times, wince at the hours of lost production, and conclude: “We have to run larger batches.” This decision feels rational. It feels responsible. It feels like good management. And it is slowly killing their companies.The logic is seductive in its simplicity.

A stamping press requires two hours to change from Product A to Product B. During those two hours, the machine produces nothing. The operator’s labor continues. The overhead allocated to that machine—building depreciation, maintenance, management salaries—continues to accrue. If you spread that two-hour cost across ten thousand parts, each part carries a tiny setup burden.

If you spread it across only one hundred parts, each part carries an enormous setup burden. The conclusion seems obvious: produce more parts per setup. Run larger batches. Push inventory downstream.This is the Batch Trap. It is not a theory.

It is a daily reality in factories across every industry. And it is built upon an assumption so deeply embedded in traditional accounting that no one thinks to question it. The assumption is this: changeover time is a fixed cost of production, like the cost of steel or electricity. You cannot change it. You can only amortize it.Shigeo Shingo proved this assumption false.

When he arrived at a Mazda stamping plant in 1950, he witnessed a four-hour die change. By 1970, he had reduced that same changeover to three minutes. The physical machine was unchanged. The dies were unchanged. The products were unchanged.

What changed was Shingo’s understanding of what a changeover actually is. He realized that most of those four hours were not necessary. They were waste—the residue of poor organization, poor tools, and poor thinking.This chapter is about escaping the Batch Trap. We will examine why traditional batch size calculations are fundamentally flawed when applied to changeovers that can be reduced. We will explore the relationship between setup time and every major lean manufacturing method—Just-In-Time, Heijunka, Kanban, and one-piece flow.

We will dissect the seven wastes of manufacturing through the specific lens of changeover activity. And we will build the…

This is the end of the free sample. Get the eBook to keep going. Buy now

Read a sample →

Contents

  1. Chapter 1
  2. Chapter 2
  3. Chapter 3
  4. Chapter 4
  5. Chapter 5
  6. Chapter 6
  7. Chapter 7
  8. Chapter 8
  9. Chapter 9
  10. Chapter 10
  11. Chapter 11
  12. Chapter 12

Details

Author
High Tod
Publisher
SamEnrico
Language
English
Genre
Non-Fiction, Operational Efficiency Manual, SMED
Released
2026-05-29
Pages (approx.)
133
Available as
eBook, Audiobook

Read better in the ZLOADR app

Your eBooks on your phone or tablet. Sign in with your SamEnrico account and start reading.

More by High Tod

See all