Non-FictionAI OperatorTest OptimizationCI/CD

Regression Test Selection Manual

Analyze code changes to predict which tests are li

by Renteria Lolita

  • English
  • 149 pages
  • 2026
  • SamEnrico

Analyze code changes to predict which tests are likely to fail. Run only relevant subsets of your test suite, reducing CI wait times dramatically.

Formats

About this book

Analyze code changes to predict which tests are likely to fail. Run only relevant subsets of your test suite, reducing CI wait times dramatically.

Free sample

Chapter 1: The 98% Lie--Every engineering leader believes they have a CI problem. They do not. They have a trust problem dressed up in green checkmarks.You have stared at a CI dashboard for forty-seven minutes waiting for a build to finish. You have refreshed Slack, read Hacker News, refilled your coffee, and watched the little yellow circle spin. Then the tests passed.

They almost always pass. Ninety-eight percent of the time, to be precise. That is not a guess. That is the average across five hundred engineering teams studied between 2022 and 2024. For every one hundred test executions in pre-submit pipelines, ninety-eight return green.

Your team waits nearly an hour per commit for confirmation of what everyone already suspected: the code probably works.This chapter dismantles the assumption that "running everything" is safe or responsible. It reveals why most regression test suites are designed for fear rather than speed, why flaky tests are quietly destroying your engineering culture, and why the distinction between pre-submit and post-submit pipelines is the most underutilized lever in continuous integration. By the end, you will understand why perfect safety is the enemy of fast delivery—and why the goal of regression test selection is not to catch every bug, but to catch the right bugs at the right time.The Mathematics of Wasted Time Let us begin with a simple calculation that most engineering organizations refuse to perform because the answer is too embarrassing.Assume a team of fifty developers. Each developer opens four pull requests per week. Each pull request triggers a full regression suite that takes forty-five minutes to execute.

That is 180 minutes of CI time per developer per week, or 9,000 minutes across the team. Divide by sixty to get 150 hours of CI wait time per week. Over a year, assuming forty-eight working weeks, that is 7,200 hours of developers sitting idle, waiting for tests to finish.Now factor in the fully-loaded cost of a senior engineer: salary, benefits, office space, equipment, recruiting amortization. A conservative estimate is 120perhour.Multiply7,200hoursby120 per hour. Multiply 7,200 hours by 120perhour.Multiply7,200hoursby120.

The result is $864,000 per year. That is not cloud billing. That is developer time burned on a ritual that…

This is the end of the free sample. Get the eBook to keep going. Buy now

Read a sample →

Contents

  1. Chapter 1
  2. Chapter 2
  3. Chapter 3
  4. Chapter 4
  5. Chapter 5
  6. Chapter 6
  7. Chapter 7
  8. Chapter 8
  9. Chapter 9
  10. Chapter 10
  11. Chapter 11
  12. Chapter 12

Details

Author
Renteria Lolita
Publisher
SamEnrico
Language
English
Genre
Non-Fiction, AI Operator, Test Optimization, CI/CD
Released
2026-05-30
Pages (approx.)
149
Available as
eBook, Audiobook

Read better in the ZLOADR app

Your eBooks on your phone or tablet. Sign in with your SamEnrico account and start reading.

More by Renteria Lolita

See all

You may also like

See all