Non-FictionOperational Efficiency ManualProduction Control

Production Sequencing Rules Manual

Applies FIFO, EDD, SPT, and CR sequencing rules to

by Howerton Maegan

  • English
  • 147 pages
  • 2026
  • SamEnrico

Applies FIFO, EDD, SPT, and CR sequencing rules to optimize job order, minimize lateness, and reduce work-in-process inventory.

Formats

About this book

Applies FIFO, EDD, SPT, and CR sequencing rules to optimize job order, minimize lateness, and reduce work-in-process inventory.

Free sample

Chapter 1: The Queue Never Lies--–- The production scheduler stared at the whiteboard. Forty-seven jobs. Three critical machines. Four customers screaming for updates. And somewhere in that mess, a five-million-dollar order that was already three days late.Maria had been a production scheduler for eleven years.

She had tried every system her plant offered—MRP, ERP, a brief disastrous experiment with a spreadsheet that fifty people tried to edit simultaneously. But at 3:00 PM on a Tuesday, with the shift change looming, none of those systems told her what to run next. The whiteboard told her. The whiteboard showed her the truth that no software wanted to admit: the queue was lying to her.Not intentionally, of course. Queues don't have intentions.

But the queue on her whiteboard—the neat list of job numbers, processing times, and due dates—presented a seductive illusion. It suggested that if she just worked harder, expedited faster, pushed the team longer, the line would clear. The whiteboard didn't show her the holding cost accumulating on job 4029, which had been waiting for three weeks while capital withered on the shelf. The whiteboard didn't show her that customer X's order was already late enough to trigger a contractual penalty. The whiteboard certainly didn't show her that by running the longest job next—because the foreman liked to "get the big ones out of the way"—she was about to make every single job behind it late.Maria didn't know it yet, but she was living the central contradiction of modern manufacturing.

Her plant was busy. Machines ran 92% of the time. Overtime was a line item, not an exception. By every traditional measure, the plant was efficient. And yet, nothing shipped on time.

Work-in-process inventory had grown so deep that operators needed forklifts to move between workstations. And the more they pushed, the worse it got.This book is for Maria. It is for every production scheduler, operations manager, and plant supervisor who has stared at a queue and felt the uncomfortable truth: we are measuring the wrong things, sequencing by the wrong rules, and confusing busyness with effectiveness.The…

This is the end of the free sample. Get the eBook to keep going. Buy now

Read a sample →

Contents

  1. Chapter 1
  2. Chapter 2
  3. Chapter 3
  4. Chapter 4
  5. Chapter 5
  6. Chapter 6
  7. Chapter 7
  8. Chapter 8
  9. Chapter 9
  10. Chapter 10
  11. Chapter 11
  12. Chapter 12

Details

Author
Howerton Maegan
Publisher
SamEnrico
Language
English
Genre
Non-Fiction, Operational Efficiency Manual, Production Control
Released
2026-05-30
Pages (approx.)
147
Available as
eBook, Audiobook

Read better in the ZLOADR app

Your eBooks on your phone or tablet. Sign in with your SamEnrico account and start reading.

More by Howerton Maegan

See all

You may also like

See all