Non-FictionOperational Efficiency ManualBenchmarking

Production Schedule Benchmarking Audiobook

Compare scheduling performance metrics against ind

by Poindexter Lucien

  • English
  • 148 pages
  • 2026
  • SamEnrico

Compare scheduling performance metrics against industry standards and best-in-class peers.

Formats

Free sample

Chapter 1: The 75% Lie--–- The plant manager’s voice was steady, but his hands were shaking. “I don’t understand,” Carlos said, sliding the termination letter across the conference table. “We ran the machines 24/7. My team worked overtime every weekend for three months. We expedited everything.

And I’m still being fired?”The vice president of operations didn’t look up from his laptop. “On-time delivery dropped to 54%, Carlos. The customer left. They took twenty million in annual revenue with them. Someone has to be accountable.”Carlos stood up.

“But the sales team changed the forecast four times in February. Engineering revised the BOM twice after production had already started. Procurement was late on castings by three weeks. I was scheduling blind.”The VP finally looked up. “You’re the plant manager.

The schedule is your responsibility.”That conversation, which I witnessed as a consultant brought in to “fix the mess” after Carlos’s departure, captures the single most damaging myth in manufacturing.The myth is simple and seductive: The schedule belongs to the plant floor. If production fails, the plant manager is responsible.It’s a lie. And it’s a lie that destroys careers, companies, and customer relationships every single day.The Schedule Doesn’t Break on the Plant Floor For the past twelve years, I’ve analyzed production data from more than two hundred manufacturing facilities across North America and Europe. The facilities ranged from automotive tier-one suppliers and industrial equipment job shops to food processors and pharmaceutical packagers. Some were world-class.

Most were average. A handful were genuinely struggling to survive.The question I kept asking was simple: Where do scheduling problems actually originate?Not where do they become visible—which is always the plant floor, because that’s where the physical product either moves or stops moving. But where do the underlying failures begin? The forecast that was wrong. The engineering change that arrived too late.

The purchase order that was released after the production schedule was already locked. The customer who changed their mind. The supplier who shipped late.Here’s what the data showed: in the average manufacturing organization, approximately seventy-five percent of schedule deviations originate outside the four walls of the production facility.Let me say that again, because it’s the entire premise of this book and because it will be challenged by every VP of operations who has ever fired a plant manager for…

This is the end of the free sample. Get the Audiobook to keep going. Buy now

About this book

Compare scheduling performance metrics against industry standards and best-in-class peers.

Details

Author
Poindexter Lucien
Publisher
SamEnrico
Language
English
Genre
Non-Fiction, Operational Efficiency Manual, Benchmarking
Released
2026-05-29
Pages (approx.)
148
Available as
eBook, Audiobook

Listen in the VoxFlicks app

Audiobooks and audio dramas wherever you go. Sign in with your SamEnrico account and press play.

More by Poindexter Lucien

See all

You may also like

See all