Non-FictionBusiness BriefDesign

Pop Up Design Build Guide

Create temporary retail interiors that assemble fa

by Tapia Kathe

  • English
  • 135 pages
  • 2026
  • SamEnrico

Create temporary retail interiors that assemble fast and fit in suitcases. Use modular displays, tension fabric, and lighting that works across three cities.

Formats

About this book

Create temporary retail interiors that assemble fast and fit in suitcases. Use modular displays, tension fabric, and lighting that works across three cities.

Free sample

Chapter 1: The Freight Elevator Trap...--It was 10:47 PM on a Tuesday when I watched a grown woman — a CEO who had raised eighteen million dollars and built a national brand from her apartment — sit down on a dirty loading dock in lower Manhattan and cry.Not a single tear. Not quiet frustration. Real, heaving, makeup-running, I-have-a-flight-at-6-AM crying.Her name was Sarah (not her real name, but she gave me permission to tell the story this way). She had flown in from Los Angeles that morning to open a three-day pop-up store in So Ho. The venue was a prime retail space she had secured at the last minute — a favor from a landlord who believed in her brand.

The display was custom-built by a production company she had paid $47,000. It was supposed to be her masterpiece. Her physical proof that the DTC brand was ready for the real world of brick-and-mortar retail.The production company had delivered the display earlier that day. They had built it in a warehouse in New Jersey, disassembled it, loaded it onto a truck, and shipped it to Manhattan. The delivery driver had called at 6 PM to say he was stuck in traffic on the Holland Tunnel.

At 8 PM, he arrived. At 9 PM, he tried to get the crates into the freight elevator.The crates were two inches too wide.Two inches.The freight elevator in that building — like thousands of freight elevators in older New York City buildings — had a door opening of 48 inches. The crates were 50 inches wide. The production company had never asked about elevator dimensions. They had built to their own standard, not to the building's.Sarah had three options at 10:47 PM:Option one: Unpack the entire display on the sidewalk — all 200 pounds of it — and carry each piece up the service stairs piece by piece.

Estimated time: four hours. Estimated cost in labor (if she could find anyone willing to do it at midnight): $1,500. Estimated risk of damage to the display: near certain.Option two: Find a carpenter who could cut down the crates and reassemble the display on…

This is the end of the free sample. Get the eBook to keep going. Buy now

Read a sample →

Contents

  1. Chapter 1
  2. Chapter 2
  3. Chapter 3
  4. Chapter 4
  5. Chapter 5
  6. Chapter 6
  7. Chapter 7
  8. Chapter 8
  9. Chapter 9
  10. Chapter 10
  11. Chapter 11
  12. Chapter 12

Details

Author
Tapia Kathe
Publisher
SamEnrico
Language
English
Genre
Non-Fiction, Business Brief, Design
Released
2026-06-01
Pages (approx.)
135
Available as
eBook, Audiobook

Read better in the ZLOADR app

Your eBooks on your phone or tablet. Sign in with your SamEnrico account and start reading.

More by Tapia Kathe

See all

You may also like

See all