Non-FictionBusiness BriefProject Management

Planning Fallacy Counter Audiobook

Realistically estimates project timelines.

by Baird Josephina

  • English
  • 142 pages
  • 2026
  • SamEnrico

Realistically estimates project timelines.

Formats

Free sample

Chapter 1: The Optimism Machine--–- It begins, as these things often do, not with a spreadsheet or a Gantt chart, but with a conversation in a kitchen. The conversation is between two people who love each other—let’s call them Sarah and Michael. They are standing in their cramped, avocado-tiled kitchen in a modest bungalow in a city that could be anywhere. The microwave is from 1998. The cabinets are warped.

And Sarah, who has been saving for three years, finally says the words that will launch a thousand change orders: “Let’s renovate.”Michael, who is an engineer and therefore believes in the perfectibility of plans, nods enthusiastically. He has already sketched a rough timeline on a napkin. Demolition: three days. Electrical and plumbing: one week. Cabinets: four days.

Flooring: two days. Paint: one day. Contingency: three days. Total: twenty-two days. Less than a month.

He shows Sarah the napkin with the pride of a general unveiling a battle map.Sarah looks at the napkin. She has renovated a bathroom once, six years ago, in a different house, with a different contractor, and she remembers something about that experience that Michael has conveniently forgotten: it took four months. She says, “I think it’s going to take longer. Maybe three months.”Michael laughs. He is an engineer.

He has calculated. “Three months? That’s four times my estimate. Come on. It’s a kitchen, not the Sydney Opera House.”They compromise, as couples do, on six weeks.

Six weeks feels reasonable. It is longer than Michael’s twenty-two days but shorter than Sarah’s three months. It is the kind of number that makes both people feel like they have been heard. It is a complete fiction.Six weeks later, the kitchen is a skeleton. The demolition took five days, not three, because there was an extra layer of tile hidden under the linoleum.

The plumber didn’t show up for four days because his daughter had the flu. The cabinets arrived wrong—the wrong wood, the wrong dimensions, the wrong continent, it seemed—and had to be reordered, adding ten days. The electrician discovered wiring that was not up to code, which required a permit, which required an inspection, which required waiting. By week eight, Sarah and Michael are eating takeout on paper plates in the living room, surrounded by dust and the smell of drywall compound, and they have stopped…

This is the end of the free sample. Get the Audiobook to keep going. Buy now

About this book

Realistically estimates project timelines.

Details

Author
Baird Josephina
Publisher
SamEnrico
Language
English
Genre
Non-Fiction, Business Brief, Project Management
Released
2026-06-06
Pages (approx.)
142
Available as
eBook, Audiobook

Listen in the VoxFlicks app

Audiobooks and audio dramas wherever you go. Sign in with your SamEnrico account and press play.

More by Baird Josephina

See all

You may also like

See all