Non-FictionInformativeEducational

Operational Risk Management in Tech

A Coursebook on Operational Risk Management in Tec

by Oconnell Keeley

  • English
  • 133 pages
  • 2026
  • SamEnrico

A Coursebook on Operational Risk Management in Tech

Formats

About this book

A Coursebook on Operational Risk Management in Tech

Free sample

Inconsistencies and Repetitions in "The Tech Resilient Organization"A rigorous editorial review reveals several structural, conceptual, and pedagogical issues. Below is a categorized breakdown.I. Conceptual Inconsistencies (Internal Contradictions)1. The "Legacy ORM is dead" vs. "Use Basel/Three Lines" contradiction Chapter Position Problem Ch 1Legacy ORM frameworks "fail dramatically" in agile/cloud environments Declares traditional approaches obsolete Ch 2Adapts Basel Committee event types to modern tech Basel is a legacy ORM framework Ch 4Reimagines Three Lines of Defense for Dev Ops Three Lines is a legacy governance model Inconsistency: You cannot simultaneously claim traditional frameworks are fatally flawed and then spend two chapters adapting them.

Either Basel/Three Lines have enduring value (in which case Ch 1 is overstating) or they are truly obsolete (in which case Ch 2 and 4 are retrograde).Fix: Reframe Ch 1: "Legacy ORM as traditionally implemented (annual, spreadsheet-based, siloed) fails. But the principles within frameworks like Basel and Three Lines can be adapted—which we do in Ch 2 and 4."2. "Five-nines is insufficient" vs. "Use uptime metrics in RAROC"Chapter Position Ch 1Explicitly states: "Explain why 'five-nines availability' is insufficient as a risk metric"Ch 3Uses uptime/downtime as core inputs to RAROC calculations Inconsistency: If five-nines is insufficient, why build financial models around the same availability concept? The book never clarifies what replaces five-nines—it only critiques it.Fix: Introduce an alternative metric suite in Ch 1 (e.g., "error budget," "failure domain blast radius," "time to degraded state") and use those in Ch 3 instead of raw uptime.3.

RTO/RPO placement across two disconnected chapters Chapter Content Ch 3Risk tolerance statements include "recovery time objectives" (mentioned as KRAS metric)Ch 11RTO and RPO defined as technical concepts in disaster recovery Inconsistency: Ch 3 introduces RTO as a board-level risk appetite metric. Ch 11 introduces RTO as a technical DR concept—without referencing Ch 3. A reader encounters the same term twice, with different implied owners (board vs. engineers), and no bridge explaining that strategic RTO (board) should drive technical RTO (engineering).Fix: Ch 3 introduces "Strategic RTO" (business expectation). Ch 11 references back: "Recall the strategic RTO from Ch 3; now here is…

This is the end of the free sample. Get the eBook to keep going. Buy now

Read a sample →

Contents

  1. Chapter 1
  2. Chapter 2
  3. Chapter 3
  4. Chapter 4
  5. Chapter 5
  6. Chapter 6
  7. Chapter 7
  8. Chapter 8
  9. Chapter 9
  10. Chapter 10
  11. Chapter 11
  12. Chapter 12

Details

Author
Oconnell Keeley
Publisher
SamEnrico
Language
English
Genre
Non-Fiction, Informative, Educational
Released
2026-06-02
Pages (approx.)
133
Available as
eBook, Audiobook

Read better in the ZLOADR app

Your eBooks on your phone or tablet. Sign in with your SamEnrico account and start reading.

More by Oconnell Keeley

See all

You may also like

See all