Non-Fiction, Self-Help, Construction

Networking for Construction eBook

Builds subcontractor and supplier relationships.

by Sherrill Marci

  • English
  • 146 pages
  • 2026
  • SamEnrico

Builds subcontractor and supplier relationships.

Formats

Free sample

Chapter 1: The Stupidity Tax--–- Every time you take the lowest bid on a framing package, an MEP trade, or a drywall scope, you are paying a tax. You cannot see this tax on any invoice. Your accountant will not flag it. Your project management software will not calculate it. But it is the single largest expense on your profit and loss statement, and you have been paying it willingly for your entire career.This tax is called the Stupidity Tax.Here is how it works.

A subcontractor submits a bid that is 15 percent lower than their nearest competitor. You celebrate. Your estimator feels validated. The owner is thrilled. You sign the contract.

Then the project starts. The sub requests a change order for site conditions they “could not have anticipated” – conditions that every other bidder anticipated and priced accordingly. The sub falls behind schedule, then blames your material delivery. The sub cuts corners on safety because their margin evaporated the day they signed. The sub files a lien when you push back on their fourth change order.

You spend 200 hours of project manager time fighting battles you should never have had to fight. You pay legal fees. You pay for rework. You pay for the owner’s lost patience.By the time the dust settles, that “cheap” sub has cost you 30 percent more than the second-lowest bidder. But you will never know that, because you do not track total cost of risk.

You only track the bid price.This book exists to make you stop being stupid.The Confession Every GC Needs to Make Before we go any further, let me confess something on behalf of every general contractor reading this. You already know the low-bid system is broken. You have known it for years. You have watched the same unreliable subs cycle through your projects, leaving a trail of rework, delays, and animosity. You have complained about it in the trailer.

You have vented to your spouse. But when the next bid package goes out, you do the same thing you have always done. You sort by price. You pick the lowest number. You cross your fingers.Why?

Because your owner demands it. Because your competition does it. Because “that’s how construction works.”That is not a reason. That is an excuse. And it is costing you millions.This chapter makes a single argument, and it is an argument that will offend every procurement officer, every public works director, and every old-school estimator who has ever said “low bid is the only fair way.” Here it is: For strategic trades, the low bid is not just a bad idea.

It is an actively destructive practice that destroys trust, incentivizes lying, and transfers risk from the owner to the GC.But – and this is critical – this argument applies ONLY to strategic trades. Throughout this book, we will distinguish between two completely different categories of subcontractors and suppliers. Confusing these two categories is the original sin of construction procurement.The Two Categories That Will Save Your Career Before we can fix the low-bid problem, we have to stop treating all trades as if they are the same. They are not.Category One: Strategic Trades These are the subcontractors whose work has high impact on schedule, safety, quality, and the owner’s ultimate satisfaction. They are the trades that, if they fail, bring the entire project down with them.

Strategic trades include:Framing and structural steel Mechanical, electrical, and plumbing (MEP)Fireproofing and fire suppression Drywall and finishing (when scoped together)Roofing and waterproofing Glazing and curtain wall Elevators and conveying systems Major site civil work These trades require relationships. They require trust. They require that the subcontractor cares about your success as much as their own. You cannot buy a strategic trade from the lowest bidder and expect anything other than disaster. You might get lucky once.

You will not get lucky ten times.Category Two: Commodity Trades These are the subcontractors and suppliers whose work is interchangeable, low-risk, and easily replaced. If a commodity trade fails, you can find another one tomorrow. Commodity trades include:Temporary fencing and barricades Roll-off dumpsters and waste removal Portable toilets and site sanitation Basic aggregates and fill dirt Temporary labor and flagging Equipment rental (standard equipment)Basic landscaping (non-structural)These trades should be bid on price every single time. Do not build relationships with your porta-potty provider. Do not take your dumpster rental guy to coffee.

Bid them, beat them down on price, and move on.The fatal mistake that destroys most GCs is treating strategic trades like commodities. When you bid a framing package the same way you bid a fencing package, you signal to the framing sub that you do not value their expertise, their reliability, or their relationship. They respond by bidding accordingly – low enough to win, then making up the difference elsewhere.The second fatal mistake is treating commodity trades like strategic partners. You do not need a long-term alliance with the portable toilet company. You need the cheapest clean toilets on the site.

That is all.The Winner’s Curse in Construction Economists have a term for what happens when the lowest bidder wins a contract. They call it the Winner’s Curse. In auctions for common-value items – items where the true value is the same for all bidders but unknown at the time of bidding – the winner is systematically the bidder who most underestimated the true cost. The winner wins, then loses.Construction subcontract bidding is a textbook example of the Winner’s Curse. Every bidder is pricing the same scope of work.

The true cost of performing that work is unknown but roughly similar for all qualified bidders. The bidder who wins is almost always the one who made the most optimistic – read: unrealistic – assumptions about productivity, material costs, and site conditions.Here is what happens next. That winning sub realizes two weeks into the project that they are going to lose money. They have three choices:Absorb the loss and perform the work correctly (rare – most subs cannot afford this)Cut corners on quality, safety, or both (common)Aggressively pursue change orders to recover their lost margin (very common)Most subs choose a combination of options two and three. They cut corners where they think they can get away with it, and they submit change orders for everything else.

By the time the project ends, the GC has paid the original bid price plus the cost of rework, plus the cost of managing disputes, plus the cost of the owner’s diminished trust.The Winner’s Curse is not a moral failing of subcontractors. It is a structural feature of the low-bid system. You cannot blame the sub for trying to survive. You can blame yourself for creating the incentives.The Transaction Costs You Are Not Tracking Let us get specific about money. Most GCs track the bid price and the final contract value, including change orders.

They see the delta and assume that the sub “screwed them.” But they almost never track the full transaction cost of switching subs, managing low performers, and fixing mistakes.Here are the costs you are not counting:Vetting and…

This is the end of the free sample. Get the eBook to keep going. Buy now

About this book

Builds subcontractor and supplier relationships.

Details

Author
Sherrill Marci
Publisher
SamEnrico
Language
English
Genre
Non-Fiction, Self-Help, Construction
Released
2026-06-06
Pages (approx.)
146
Available as
eBook, Audiobook

Read better in the ZLOADR app

Your eBooks on your phone or tablet. Sign in with your SamEnrico account and start reading.

More by Sherrill Marci

See all

You may also like

See all