Non-FictionOperational Efficiency ManualLean Manufacturing

Heijunka Production Leveling Handbook

Implements Toyota's heijunka technique to level pr

by Delvalle Angele

  • English
  • 151 pages
  • 2026
  • SamEnrico

Implements Toyota's heijunka technique to level production volume and mix, reducing mura (unevenness) and muri (overburden) in operations.

Formats

About this book

Implements Toyota's heijunka technique to level production volume and mix, reducing mura (unevenness) and muri (overburden) in operations.

Free sample

Chapter 1: The 3AM Revelation--–- The phone rang at 3:14 AM on a Tuesday. Not because anything extraordinary had happened—because in Mike's world, 3:14 AM calls were ordinary. The night shift supervisor, a grizzled veteran named Frank who had seen three plant managers come and go, delivered the same script he had used a dozen times before."Line's down again," Frank said, his voice flat with exhaustion. "Stamping press three. Changeover was supposed to take forty minutes.

We're on hour three. The customer's truck is waiting at the dock. And I just sent two operators home because they were ready to walk out."Mike swung his legs out of bed, already calculating in his head. Forty-five minute drive. At least two hours to get the press running.

The customer would scream. The VP of operations would ask questions he didn't want to answer. And somewhere in the chaos, another day would slip by without anyone asking the one question that mattered: Why does this keep happening?He had been a plant manager for eighteen months. Before that, he had been a production supervisor, a continuous improvement lead, and briefly a quality engineer. He had read Lean books.

He had attended Kaizen events. He had implemented 5S in three different departments and watched it fall apart twice. He believed, with the certainty of someone who had never truly tested his beliefs, that he understood manufacturing.The 3:14 AM call proved he understood nothing.The Quiet Crisis No One Talks About Mike's plant was not unusual. It was a mid-sized automotive supplier employing 450 people, producing stamped metal components for three major OEMs. On paper, the numbers looked acceptable.

On-time delivery hovered around 88 percent. Quality was decent—not great, but decent. Utilization rates on the big stamping presses were consistently above 90 percent, which made the CFO happy.But the plant was dying by a thousand cuts. Overtime had increased 40 percent in two years. The maintenance budget had doubled as machines were run harder and faster to catch up from the previous crisis.

Turnover among production associates was running at 60 percent annually—people simply could not sustain the pace of firefighting. And Mike…

This is the end of the free sample. Get the eBook to keep going. Buy now

Read a sample →

Contents

  1. Chapter 1
  2. Chapter 2
  3. Chapter 3
  4. Chapter 4
  5. Chapter 5
  6. Chapter 6
  7. Chapter 7
  8. Chapter 8
  9. Chapter 9
  10. Chapter 10
  11. Chapter 11
  12. Chapter 12

Details

Author
Delvalle Angele
Publisher
SamEnrico
Language
English
Genre
Non-Fiction, Operational Efficiency Manual, Lean Manufacturing
Released
2026-06-01
Pages (approx.)
151
Available as
eBook, Audiobook

Read better in the ZLOADR app

Your eBooks on your phone or tablet. Sign in with your SamEnrico account and start reading.

More by Delvalle Angele

See all

You may also like

See all