Non-Fiction, Forecast & Outlook, Cargo Claims

Freight Claims Management Guide

Project cargo claim processing automation, damage

by Spradlin Jefferey

  • English
  • 155 pages
  • 2026
  • SamEnrico

Project cargo claim processing automation, damage reduction technology, and insurance digitization.

Formats

About this book

Project cargo claim processing automation, damage reduction technology, and insurance digitization.

Free sample

Chapter 1: The Hard Market...--The phone rang at 11:47 PM on a Tuesday. Maria Vasquez, claims manager for a mid-sized project logistics firm, almost didn't answer. She was three glasses of wine into a failed attempt to forget the quarterly report she'd submitted that morning. But the caller ID showed the CEO's name. She answered."It's the Chile shipment," he said.

"The turbine. It's gone."Maria felt the wine evaporate from her bloodstream. The "turbine" was a 4.2milliongasturbineboundforapowerplantexpansionoutside Santiago.Hercompanyhadspentsixmonthsplanningthemove:specializedflatbedtrailers,acharteredvessel,portsurveys,engineeringstudies,and4.2 million gas turbine bound for a power plant expansion outside Santiago. Her company had spent six months planning the move: specialized flatbed trailers, a chartered vessel, port surveys, engineering studies, and 4.2milliongasturbineboundforapowerplantexpansionoutside Santiago.Hercompanyhadspentsixmonthsplanningthemove:specializedflatbedtrailers,acharteredvessel,portsurveys,engineeringstudies,and187,000 in insurance premiums. The turbine had left the port of Houston three weeks ago.

It was supposed to arrive in Valparaiso tomorrow."Gone how?" Maria asked."Not gone-lost. Gone-damaged. The surveyor just emailed. There's a crack in the housing. Eighteen inches.

They think it happened during the rail transfer in San Antonio."Maria closed her eyes. She knew exactly what this meant. Not just the repair cost – that would be six figures at minimum. The real nightmare was the delay. The power plant was scheduled to go online in ninety days.

Each day of delay meant $75,000 in liquidated damages. If the turbine needed to be sent back to the manufacturer – and Maria suspected it would – that was six months. Eighteen thousand dollars per day. Four million dollars in penalties. Her company's entire annual profit margin on the Chile account, erased."Did we have the signed MSA with the rail carrier?" Maria asked.Silence."Maria, we need to talk about the MSA."She already knew what he was going to say.

The Master Service Agreement that her legal department had signed eighteen months ago contained a clause that she had flagged, highlighted, and argued against in three separate meetings. Clause 14.7: "Forwarder agrees to indemnify and hold harmless Carrier for any and all consequential damages arising from delay, regardless of fault."She had written a memo. She had circulated…

This is the end of the free sample. Get the eBook to keep going. Buy now

Read a sample →

Contents

  1. Chapter 1
  2. Chapter 2
  3. Chapter 3
  4. Chapter 4
  5. Chapter 5
  6. Chapter 6
  7. Chapter 7
  8. Chapter 8
  9. Chapter 9
  10. Chapter 10
  11. Chapter 11
  12. Chapter 12

Details

Author
Spradlin Jefferey
Publisher
SamEnrico
Language
English
Genre
Non-Fiction, Forecast & Outlook, Cargo Claims
Released
2026-06-01
Pages (approx.)
155
Available as
eBook, Audiobook

Read better in the ZLOADR app

Your eBooks on your phone or tablet. Sign in with your SamEnrico account and start reading.

More by Spradlin Jefferey

See all