Non-FictionOperational Efficiency ManualDirectional Scheduling

Forward Backward Scheduling

Schedule from due date backward or from start date

by Hobson Yajaira

  • English
  • 140 pages
  • 2026
  • SamEnrico

Schedule from due date backward or from start date forward depending on production environment.

Formats

About this book

Schedule from due date backward or from start date forward depending on production environment.

Free sample

Chapter 1: The 3 AM Phone Call...--The phone rings at 3:17 AM on a Tuesday. You are the plant manager. The caller ID shows the name of your largest customer—the one that represents 40 percent of your annual revenue. You answer, already knowing what comes next. Their voice is tired, not angry yet, but close.

"The shipment was supposed to leave at 6 PM yesterday. It is now 3 AM. My line goes down in four hours. Where is my order?"You have no good answer. Your ERP system says the order is on time.

Your production supervisor says the order is still waiting for a part. Your scheduler says the system is working exactly as designed. Three different people. Three different answers. One customer about to shut down their assembly line.This is not a software problem.

It is not a people problem. It is a scheduling problem. And it is the most expensive problem in manufacturing that almost no one talks about.Welcome to the hidden war inside every factory. On one side stands Forward Scheduling—the logic of starting now and pushing work through the system. On the other side stands Backward Scheduling—the logic of starting from the due date and pulling work backward through time.

Most production planners inherit one method, assume it is correct, and spend their careers fighting fires instead of preventing them. This chapter will change that.You are about to learn why your schedule is probably lying to you, how to tell the difference between a real due date and a fictional one, and why the single most important question in production scheduling is not "how fast can we go?" but "where do we anchor time?"The Great Deception of Modern ERP Systems Every manufacturing ERP system on the market—SAP, Oracle, Infor, Microsoft Dynamics, Epicor, and dozens more—contains scheduling logic. That logic makes assumptions. Those assumptions are almost never explained to the people using the system. This is the great deception.Here is what your ERP assumes by default: infinite capacity, fixed lead times, and a single scheduling direction that never changes.

These three assumptions are wrong for most factories most of the time. Yet millions of planners go to work every…

This is the end of the free sample. Get the eBook to keep going. Buy now

Read a sample →

Contents

  1. Chapter 1
  2. Chapter 2
  3. Chapter 3
  4. Chapter 4
  5. Chapter 5
  6. Chapter 6
  7. Chapter 7
  8. Chapter 8
  9. Chapter 9
  10. Chapter 10
  11. Chapter 11
  12. Chapter 12

Details

Author
Hobson Yajaira
Publisher
SamEnrico
Language
English
Genre
Non-Fiction, Operational Efficiency Manual, Directional Scheduling
Released
2026-06-01
Pages (approx.)
140
Available as
eBook, Audiobook

Read better in the ZLOADR app

Your eBooks on your phone or tablet. Sign in with your SamEnrico account and start reading.

More by Hobson Yajaira

See all

You may also like

See all