Non-FictionOperational Efficiency ManualERP Integration
ERP Production Scheduling eBook
Use ERP modules for material requirements planning
by Martin Jack
Use ERP modules for material requirements planning and capacity requirements planning integration.
Formats
Free sample
Chapter 1: The Silo Trap--–- The warehouse was full. Not just organized-full, but chaos-full. Pallets of raw steel stacked three high blocked the emergency exits. Specialty fasteners ordered eight weeks ago sat in cardboard boxes still sealed with packing tape. Inventory turns had dropped to 2.1—down from 4.8 the previous year.
The CFO was demanding answers. Meanwhile, thirty feet away on the shop floor, the company’s most expensive CNC machining center sat idle. Its operator leaned against a workbench, scrolling through his phone. The machine had been waiting for four hours for a setup change that required a specific tool that was, according to the system, “in stock.” It was not. The tool was on a bench in the tool crib, buried under a pile of requisition forms.
The production scheduler, a twenty-year veteran named Diane, had just received her third expedite request of the day from the sales team. A key customer had moved up their delivery date. Diane looked at the finite schedule on her screen. The CNC center was already booked solid for the next two weeks. She sighed, opened her spreadsheet, and began the painful process of manually moving jobs—knowing full well that every move would trigger a cascade of material shortages, supplier reschedules, and expediting fees.
This was not a bad day. This was every day.This scene plays out in thousands of manufacturing companies around the world. The specific names, parts, and software systems change, but the pattern is universal. Materials arrive before they are needed, clogging warehouses with cash that could be used elsewhere. Capacity is planned without regard to material availability, so machines sit idle waiting for components.
Sales promises dates that neither materials nor capacity can support. And the people caught in the middle—the production schedulers, the procurement managers, the shop floor supervisors—work longer and harder each quarter just to keep delivery performance from collapsing entirely.The Great Disconnect Defined The problem at the heart of this book is not lazy workers, greedy customers, or incompetent software vendors. The problem is structural, organizational, and systemic. It is a problem that I call The Great Disconnect—the historical, often invisible divide between the two halves of every manufacturing operation: the material side and the capacity side.On the material side sit the procurement team, the inventory analysts, the warehouse staff, and the supplier relationship managers. Their world is measured in purchase orders, lead times, safety stock levels, and inventory turns.
Their tools are Material Requirements Planning (MRP) systems, reorder point calculators, and economic order quantity formulas. Their success metric is simple: did the material arrive when needed, at the right price, without tying up too much cash? A procurement manager who keeps the line running while reducing inventory is a hero.On the capacity side sit the shop floor supervisors, the maintenance team, the production schedulers, and the manufacturing engineers. Their world is measured in machine utilization, setup times, throughput, and on-time delivery. Their tools are Gantt charts, finite schedulers, dispatch lists, and capacity requirements planning (CRP) systems.
Their success metric is also simple: did the work get done on time, at the right quality, without breaking the machines? A production manager who ships every order on time while keeping machines humming is a hero.Here is the problem. These two teams operate from different data sets, different time horizons, and different incentive structures. The procurement team plans in weeks and months, driven by supplier lead times. The shop floor plans in hours and days, driven by machine run times.
The procurement team’s data comes from purchase order histories and supplier scorecards. The shop floor’s data comes from routing times and work center calendars. The procurement team is rewarded for low inventory. The shop floor is rewarded for high utilization. These two rewards are in direct conflict.The result is a factory that operates like two separate companies sharing a building.
Materials arrive early because procurement ordered based on a forecast that did not account for capacity constraints. Machines sit idle because the production schedule assumed materials would arrive that did not. No single person is at fault. The system itself is broken.The Cost of Silos: Inventory Bloat and Late Penalties The cost of The Great Disconnect appears in two forms, each with its own financial signature. The first is inventory bloat.
When materials arrive before capacity can process them, they sit. They occupy warehouse space that costs money per square foot. They tie up working capital that could be used for new product development, marketing, or debt reduction. They risk obsolescence—especially for products with short life cycles or engineering changes. And they create what supply chain experts call “hidden factories”: the labor required to receive, inspect, store, move, and count inventory that should not be there yet.The financial impact is staggering.
According to the Inventory Management Institute, companies with disconnected planning processes carry an average of 25–35% more inventory than companies with integrated MRP/CRP. For a mid-sized manufacturer with 50millioninannualrevenue,thatis50 million in annual revenue, that is 50millioninannualrevenue,thatis12–17 million of excess working capital. At a typical cost of capital of 8%, that excess inventory costs nearly $1.4 million per year in carrying costs alone. And that does not include the hidden costs of warehouse space, labor, and obsolescence.The second form of cost is late penalties and expediting fees. When capacity is planned without regard to material availability, or when material is planned without regard to capacity, shipments miss their dates.
Customers demand discounts, free shipping, or outright penalties. According to industry benchmarks, companies with disconnected planning processes experience on-time delivery rates of only 65–75%. A 10% improvement in on-time delivery typically increases customer retention by 15% and reduces expediting costs by 20–30%.But the cost of lateness goes beyond direct penalties. Late shipments trigger a cascade of reactive behaviors. Salespeople promise expedite fees to customers.
Planners move jobs ahead of other jobs, which delays those other jobs. Procurement pays premium freight charges to rush missing components. The shop floor works overtime, burning through labor budgets and increasing the risk of quality defects. Each of these reactions adds cost. None of them address the root cause.The Constrained Plan: A New North Star This book offers a different way.
The solution is not better software, faster computers, or more expensive consultants. The solution is a single, simple idea that redefines what a production schedule actually means.The Constrained Plan is a production schedule that is considered valid only if it simultaneously satisfies two conditions:Material availability: every required component is on hand or scheduled to arrive before it is needed, based on confirmed supplier lead times.Capacity availability: every required work center has enough available time to complete its assigned work, based on confirmed machine and labor calendars.Any plan that fails either condition is not a plan. It is a wish. It is a forecast. It is a spreadsheet exercise.
It is not something you can give to a shop floor supervisor and expect actual products to ship on actual trucks to actual customers.The Constrained Plan is the North Star of this book. Every chapter, every tool, every case study is designed to help you achieve it.…
This is the end of the free sample. Get the eBook to keep going. Buy now
About this book
Details
- Author
- Martin Jack
- Publisher
- SamEnrico
- Language
- English
- Genre
- Non-Fiction, Operational Efficiency Manual, ERP Integration
- Released
- 2026-05-29
- Pages (approx.)
- 152
- Available as
- eBook, Audiobook
Read better in the ZLOADR app
Your eBooks on your phone or tablet. Sign in with your SamEnrico account and start reading.
More by Martin Jack
Email Automation HandbookMartin Jack$11.99
Conversation Starters for CoworkersMartin Jack$11.99
Remote Small Talk GuideMartin Jack$11.99
Mayor of the Port CityMartin Jack$11.99
Angel Cabrera Argentinian PowerMartin Jack$11.99
The Last Empress: How a Teenage Girl Became China's Most Powerful RulerMartin Jack$11.99
The Silk Road Kingpin: How a Tech Genius Built a Dark Web EmpireMartin Jack$11.99
Branch YC Application TipsMartin Jack$12.99
Understanding Cleft Tongue SyndromeMartin Jack$17.99
Systems DeveloperMartin Jack$11.99
Ultimate Handbook Guide to Shihezi : (China) Travel GuideMartin Jack$11.99You may also like
Hong Kong Handover 1997Dunn Johnnie$11.99
Zumba For Postnatal Recovery CourseNeal Christian$11.99
Zumba for BeginnersLadner Nikia$11.99
YouTube Comment Mining GuideHumes Pandora$12.99
Worry Box MeditationCarlin Rudy$11.99
Workplace Stress MeditationNguyen Lynn$11.99
Workplace Stress and Sleep RepairHawley Ivory$11.99
Workplace Perfectionism CureDelaney Jeffry$11.99
Workplace Injustice Anger GuideWallen Isabelle$11.99
Work Addiction and Burnout LinkGreenwood Ester$11.99
Women in Yoga and WellnessBeattie Galina$11.99
Women in Stand Up ComedyChun Evangeline$11.99