Non-FictionOperational Efficiency ManualAgile Methods

Agile Production Scheduling

Use sprint-based scheduling for high-mix, low-volu

by Rountree Deb

  • English
  • 147 pages
  • 2026
  • SamEnrico

Use sprint-based scheduling for high-mix, low-volume environments with frequent changeovers.

Formats

About this book

Use sprint-based scheduling for high-mix, low-volume environments with frequent changeovers.

Free sample

Chapter 1: The Monday Morning Massacre--–- 7:32 AM on a humid September morning. Carla Vasquez, production scheduler at Mc Kenna Manufacturing, stared at her three monitors with the particular numbness of someone who had not slept more than four hours in three days. Her left screen showed the master production schedule—a Gantt chart she had lovingly rebuilt on Friday, now glowing with red exception flags across seventeen different jobs. Her center screen showed her email inbox: 142 unread messages, the top five all marked “URGENT” with exclamation points. Her right screen showed the ERP system’s “recommended action” report, which was recommending that she reschedule every single order on every single line.She took a sip of cold coffee and wondered, for the third time this month, if she should have stayed in accounting.The plant floor was already humming outside her glass-walled cubicle.

First shift had started at 6:00 AM. By 6:30, the first changeover had gone wrong—a die that should have taken twenty minutes took ninety because the tooling was stored in the wrong cabinet. By 7:00, the second changeover was delayed because the operator called in sick. By 7:15, Tom Chen, the plant manager, had already walked past her desk twice, each time with a slightly tighter jaw.At 7:45, Tom stopped.“Carla. The Thompson order.

The one that was supposed to ship yesterday.”She nodded. She knew exactly which one. Job #4482. 5,000 units of a custom housing for a medical device customer. Due last Thursday.

Now due “yesterday” in Tom’s parlance.“It’s in the queue,” she said. “The anodizing vendor had a backlog. They promised it by noon today.”Tom’s jaw tightened further. “Noon today means we pack and ship tomorrow. That means the customer gets it three days late.

That means we pay the contract penalty. That means I explain to the CEO why our on-time delivery is now fifty-eight percent.”Fifty-eight percent. Carla had seen the number on the monthly dashboard. It was down from sixty-two percent the month before, which was down from sixty-eight percent the year before. The trend line pointed to a very specific date…

This is the end of the free sample. Get the eBook to keep going. Buy now

Read a sample →

Contents

  1. Chapter 1
  2. Chapter 2
  3. Chapter 3
  4. Chapter 4
  5. Chapter 5
  6. Chapter 6
  7. Chapter 7
  8. Chapter 8
  9. Chapter 9
  10. Chapter 10
  11. Chapter 11
  12. Chapter 12

Details

Author
Rountree Deb
Publisher
SamEnrico
Language
English
Genre
Non-Fiction, Operational Efficiency Manual, Agile Methods
Released
2026-05-28
Pages (approx.)
147
Available as
eBook, Audiobook

Read better in the ZLOADR app

Your eBooks on your phone or tablet. Sign in with your SamEnrico account and start reading.

More by Rountree Deb

See all

You may also like

See all