Non-FictionAnnual Checkup3D PrintingAdditive

3D Printing Supply Strategy

Use 3D printing for spare parts production to redu

by Reardon Delsie

  • English
  • 149 pages
  • 2026
  • SamEnrico

Use 3D printing for spare parts production to reduce inventory and mitigate supply chain disruptions.

Formats

About this book

Use 3D printing for spare parts production to reduce inventory and mitigate supply chain disruptions.

Free sample

Chapter 1: The $10,000 O-Ring--The call came in at 2:47 on a Tuesday afternoon. A manufacturing plant in Nebraska had just lost pressure in a hydraulic line. The culprit was a rubber O-ring, size 214, durometer 70, made specifically for a pump that had been discontinued in 2019. The plant had three hours of runtime left before the entire assembly line would grind to a halt. The cost of downtime: $1.2 million per day.The supply chain manager, a forty-two-year veteran named Diane, did what she had done a thousand times before.

She opened the inventory management system. She checked the part number. The system showed zero stock at the central warehouse, zero at the regional depot, and zero at the supplier. She called the original equipment manufacturer. The OEM had stopped producing the part four years ago.

She called three aftermarket suppliers. Nothing. She called a competitor who used the same pump. They had one O-ring left, but they needed it for their own emergency.Then she called a freight forwarder. There was a container ship anchored off the coast of Long Beach, waiting to unload.

Somewhere inside that container was a box of 500 of these exact O-rings, ordered by a distributor in Ohio six months earlier. The ship had been sitting there for eleven days. The port was backed up for another two weeks. The O-rings were less than one hundred miles away as the crow flies, but they might as well have been on Mars.Diane authorized an emergency air freight shipment from a supplier in Germany. The parts would arrive in forty-eight hours.

The cost for a single O-ring, including expedited customs clearance and a private courier for the last mile: $10,000. For a part that weighed less than a nickel and cost less than a cup of coffee to manufacture.This is not an anomaly. This is not a worst-case scenario. This is Tuesday.The Long Tail That Eats Budgets For decades, supply chain management has been built on a seemingly rational foundation: hold inventory close to the point of demand, forecast future needs using historical data, and maintain service levels that keep customers…

This is the end of the free sample. Get the eBook to keep going. Buy now

Read a sample →

Contents

  1. Chapter 1
  2. Chapter 2
  3. Chapter 3
  4. Chapter 4
  5. Chapter 5
  6. Chapter 6
  7. Chapter 7
  8. Chapter 8
  9. Chapter 9
  10. Chapter 10
  11. Chapter 11
  12. Chapter 12

Details

Author
Reardon Delsie
Publisher
SamEnrico
Language
English
Genre
Non-Fiction, Annual Checkup, 3D Printing, Additive
Released
2026-06-01
Pages (approx.)
149
Available as
eBook, Audiobook

Read better in the ZLOADR app

Your eBooks on your phone or tablet. Sign in with your SamEnrico account and start reading.

More by Reardon Delsie

See all

You may also like

See all